Bryden Farnsleigh Relief Sewer, Cleveland, Ohio
Client: Northeast Ohio Regional Sewer District
• Scope: 2,600 feet of 48” tunnel
• 1,400 feet of deep open cut triple sewer (8”, 18”. 36”)
• 3,000 feet of deep open cut single sewer (36”) -- 60 dual house connections
• Value: $4,700,000
Read More on the Bryden Farnsleigh Relief Sewer project (160kb PDF)
MUSC Infrastructure Project
Client: Medical University of South Carolina
Construction Manager: Brasfield, Gorrie, Kahn, and Southern Management JV
• Scope: Vault excavations with steel sheet piling, trench excavation and bracing with
steel sheet piles. Construction of pile caps, five reinforced concrete structures.
• Installation of 96” tunnel.
• Value: $3,200,000
Read More on the Medical University of South Carolina project (180kb PDF)
Pearl River CSO Client: City of Lafayette, IN
• Scope: installed 2300' long, 12' diameter tunnel under 2nd St., downtown Lafayette, IN
• Tunnel crossed under the major rail link between Chicago and the southern United States
• Tunnel alignment contained three curves including an S curve and four access shafts
• Value: $18,785,607
Read More on the Pearl River project (180kb PDF)