Deep open cut sewer and pipeline installations in urban zones are difficult undertakings.
Excavating on busy streets in areas of multiple utilities, while maintaining safety, production
and proper shoring, requires extensive planning and efficient methods.
Triad’s engineers thoroughly evaluate geotechnical conditions, research and plan all layouts,
design the proper shoring, dewatering layouts if needed, and create means and methods
for our work before we begin. Complete resourcing and scheduling is done to assure
efficient construction.
Many miles of sewers have been installed in urban streets from small house connections
(6'') up to large interceptor sewers(72''); Depths have exceeded 26’. Triad has the support equipment and expertise to construct all sizes of sewers.
Click Here for a Printable Version of This Page (129kb PDF)